Download App
49.43% Reborn In 17th century India with Black Technology / Chapter 304: Heavy Industry Upgrade, Drishti Class Production & New Ship?

Chapter 304: Heavy Industry Upgrade, Drishti Class Production & New Ship?

November 5th, 1655

Dakshin Bhartiya Empire, Vijayanagara State, Mangalore.

Due to the exponential growth of heavy industries in the empire, the supporting industries also rose to a newfound level. This, in turn, bolstered iron production once more. At the beginning of the year, the empire's iron production relied on twenty blast furnaces spread across the empire near places where iron ore was available. These furnaces were capable of producing 10,400 tonnes of iron, and ever since, the number of blast furnaces has not stopped increasing. Currently, there are 30 functioning blast furnaces, Completely replacing the older 400-ton output Models with newer ones capable of producing 520 tonnes per year. This brings the total production of all blast furnaces in the empire to 15,600 tonnes per year, approximately 1300 tonnes per month.


CREATORS' THOUGHTS
Mithun_ReddyGaru Mithun_ReddyGaru

Have some idea about my story? Comment it and let me know.

This is the end of Part One, and download Webnovel app to continue:

Scan the QR code to download Webnovel

next chapter
Load failed, please RETRY

Gifts

Gift -- Gift received

    Weekly Power Status

    Rank -- Power Ranking
    Stone -- Power stone

    Batch unlock chapters

    Table of Contents

    Display Options

    Background

    Font

    Size

    Chapter comments

    Write a review Reading Status: C304
    Fail to post. Please try again
    • Writing Quality
    • Stability of Updates
    • Story Development
    • Character Design
    • World Background

    The total score 0.0

    Review posted successfully! Read more reviews
    Vote with Power Stone
    Rank NO.-- Power Ranking
    Stone -- Power Stone
    Report inappropriate content
    error Tip

    Report abuse

    Paragraph comments

    Login