Download App

The Library

Translator: Atlas Studios Editor: Atlas Studios

After the successful development of the steam engine, Ren Baqian directed the students to work on the deceleration and braking systems. He went to the empress to ask for steel.

The next goal was to build a circular railroad track with a diameter of 400 meters outside Lan City.

Just building a train that could run wasn't enough because the load factor, speed, and other aspects needed to be tested.

It wasn't currently possible to build a long railroad track since Dayao wasn't rich in iron resources. Thus, a circular track was the best choice in this situation.

However, what Ren Baqian wanted was a rail that required 50 kilograms of metal per meter, which was equivalent to 100 kilograms for the two rails of the track. The circumference was 1,300 meters for a railroad track that was 400 meters in diameter. Therefore, 130,000 kilograms was required.


This is the end of Part One, and download Webnovel app to continue:

Scan the QR code to download Webnovel

Load failed, please RETRY

Gifts

Gift -- Gift received

    Weekly Power Status

    Rank -- Power Ranking
    Stone -- Power stone

    Batch unlock chapters

    Table of Contents

    Display Options

    Background

    Font

    Size

    Chapter comments

    Write a review Reading Status: C643
    Fail to post. Please try again
    • Translation Quality
    • Stability of Updates
    • Story Development
    • Character Design
    • World Background

    The total score 0.0

    Review posted successfully! Read more reviews
    Vote with Power Stone
    Rank NO.-- Power Ranking
    Stone -- Power Stone
    Report inappropriate content
    error Tip

    Report abuse

    Paragraph comments

    Login