Download App
83.41% Release That Witch / Chapter 1252: The Design Bureau of Graycastle

Chapter 1252: The Design Bureau of Graycastle

Editor: Transn

The factory Garde referred to was situated at a construction site in the southern suburb.

Garde offered a ride to Roland, so Roland did not have to drive his battered mini van. In fact, he had a luxurious travel experience.

Roland had to admit that the car seat of Garde's vehicle was even more comfortable than his couch at home. He also loved the iced champagne in the freezer at the rear. It was such an addictive trip.

Nevertheless, Roland preferred coke to champagne.

Garde drove off the highway and onto a rutted road. At this point, Roland could hear the roars of machineries and see trucks and excavators everywhere.

Above the construction site hung a large banner which read, "Clover Construction Corporation Ltd.". A little farther on lay serried towering pile foundation.


This is the end of Part One, and download Webnovel app to continue:

Scan the QR code to download Webnovel

Load failed, please RETRY

Gifts

Gift -- Gift received

    Weekly Power Status

    Rank -- Power Ranking
    Stone -- Power stone

    Batch unlock chapters

    Table of Contents

    Display Options

    Background

    Font

    Size

    Chapter comments

    Write a review Reading Status: C1252
    Fail to post. Please try again
    • Translation Quality
    • Stability of Updates
    • Story Development
    • Character Design
    • World Background

    The total score 0.0

    Review posted successfully! Read more reviews
    Vote with Power Stone
    Rank NO.-- Power Ranking
    Stone -- Power Stone
    Report inappropriate content
    error Tip

    Report abuse

    Paragraph comments

    Login