After a brief conversation with Fei Zhengbin and mentioning the requirements of the Warhawk team, as well as urging him to expedite the cooperation of other research institutes, Zhao Yi began to outline the tasks that the team needed to undertake.
First of all, it was the preparatory work for the manufacturing of the engine prototype.
The manufacturing of an engine prototype is very complex, with many components not being completed within a single factory. The manufacturing of turbine blades, booster blades, stator blades, and front fan blades was all extremely troublesome work. Therefore, manufacturing had to be prepared in advance, and communication with the factory had to start early to begin mould production. Even if direct manufacturing was not immediately underway, effort had to be put into preparation because after all, time was money and could not be wasted.