Download App
33.88% The New Terra Sagas / Chapter 41: Chapter 41: QSG

Chapter 41: Chapter 41: QSG

Engineering comprised three parts; starting with the large main engines that took up the entire fifth of the aft of the ship then the engine monitoring and control area, which was a maze of pressurized platforms, catwalks, and crawlways that surrounded the main engines. These traditional fusion engines took up over 80% of the space and ran very hot and hectic, requiring around the clock monitoring and maintenance as moving parts for the massive cooling system required lubrication and its strained pipes sprung leaks frequently.


This is the end of Part One, and download Webnovel app to continue:

Scan the QR code to download Webnovel

Load failed, please RETRY

Gifts

Gift -- Gift received

    Weekly Power Status

    Rank -- Power Ranking
    Stone -- Power stone

    Batch unlock chapters

    Table of Contents

    Display Options

    Background

    Font

    Size

    Chapter comments

    Write a review Reading Status: C41
    Fail to post. Please try again
    • Writing Quality
    • Stability of Updates
    • Story Development
    • Character Design
    • World Background

    The total score 0.0

    Review posted successfully! Read more reviews
    Vote with Power Stone
    Rank NO.-- Power Ranking
    Stone -- Power Stone
    Report inappropriate content
    error Tip

    Report abuse

    Paragraph comments

    Login