Download App
81.61% Project Overworld / Chapter 111: Pipeline

Chapter 111: Pipeline

After the first week of work for the Spacol industry, the group assigned to the expansion of their Moon base started running out of crafted parts. A few days later, Keith, Jim and Tyler stocks of metal sheets were totally depleted and the construction of the pipe had to be stopped for the time being.

They had fotunately sent a supply rocket just before embarking onto the 'Triple S', but it did not seem to be enough for the six of them. Their first automatically sent rocket arrived two weeks after they landed on the Moon and their work could resume for good. Since they had turned off their 'Rocket assembler' while they were building the new 'Rocket extender' for the EOSS, there has been a pretty long calibration time for a new rocket to be build in their Earth base before being launched towards their space station.


This is the end of Part One, and download Webnovel app to continue:

Scan the QR code to download Webnovel

Load failed, please RETRY

Gifts

Gift -- Gift received

    Weekly Power Status

    Rank -- Power Ranking
    Stone -- Power stone

    Batch unlock chapters

    Table of Contents

    Display Options

    Background

    Font

    Size

    Chapter comments

    Write a review Reading Status: C111
    Fail to post. Please try again
    • Writing Quality
    • Stability of Updates
    • Story Development
    • Character Design
    • World Background

    The total score 0.0

    Review posted successfully! Read more reviews
    Vote with Power Stone
    Rank NO.-- Power Ranking
    Stone -- Power Stone
    Report inappropriate content
    error Tip

    Report abuse

    Paragraph comments

    Login