Download App
88.13% Input Log Dates / Chapter 259: Logdate 734 XX99

Chapter 259: Logdate 734 XX99

Update:

Power has gone out for a brief moment. Unknown whether it affected just the B level or the entire building. Computers are still on standby except for the 1's computer. No files were lost.

IMPORTANT:

first appearance of infected. Came from contaminated area. Took the form of expired resident, B6. Unknown if it /was/ 6. I will be compiling more updates about the infected.

Following through with defense protocol. I've tasked B2 with the job of disposer now. I have authorized my residents to terminate the infected on sight if possible.

A1, if you are reading this. I request for a server B inspection as soon as possible. We can not afford to lose power, not while we are still dealing with the aftereffects of a contamination breach.

Note, not advisable to have the lights off if there is many infected areas. Too high a risk of touching contaminated area if so. B4 has hypothesized that molded moves faster under dark lighting.

Nothing else to note.

B1


Load failed, please RETRY

Weekly Power Status

Rank -- Power Ranking
Stone -- Power stone

Batch unlock chapters

Table of Contents

Display Options

Background

Font

Size

Chapter comments

Write a review Reading Status: C259
Fail to post. Please try again
  • Writing Quality
  • Stability of Updates
  • Story Development
  • Character Design
  • World Background

The total score 0.0

Review posted successfully! Read more reviews
Vote with Power Stone
Rank NO.-- Power Ranking
Stone -- Power Stone
Report inappropriate content
error Tip

Report abuse

Paragraph comments

Login