There were many reasons for the overflow of sewage. The following were some of the possible reasons:
1. Failure of the sewage treatment facilities of the enterprise: The failure of the sewage treatment facilities of a paper factory caused the sewage to not be treated, and the sewage flowed into the nearby water body.
2. [Sewer blockage: The sewers of a certain residential area are blocked by oil, causing the sewage to not be discharged normally and flow into the residential area.]
3. [Blocked sewage pipe: The sewage pipe of a certain residential area is blocked, causing sewage to leak from the floor to other floors or corridors.]
4. Septic tank and drainage pipe facilities are old: The facilities of the manure tank and drainage pipe in the old community are old, and it is easy to cause blockage and sewage crossflow.
5. Waste water overflow in car wash shops: When some car wash shops wash cars outdoors, the sewage will flow onto the sidewalk, affecting pedestrians.
It should be noted that the above are only some possible reasons. The specific situation may vary according to the region and environment.
There were many ways to solve the problem of sewage overflow. First of all, the problem could be solved by optimization of sewage channels. The drainage of rural courtyards was usually done by digging ditches or connecting water pipes, but the drainage was small and easy to evaporate by the sun. With the popularity of tap water, sewage channels needed to be continuously optimized. In areas with scattered residences, sewage was usually treated by methods such as manure tanks, marsh gas tanks, and constructed grasslands. Secondly, the rainwater and sewage facilities could be modified to divert the sewage into the sewage pipe network. For example, by building a drainage ditch to divert sewage into the sewage pipe network, the problem of cross-flow of sewage was solved. In addition, it could also improve the sewage treatment measures and improve the sewage treatment capacity of the urban area. For example, building a sewage treatment plant to reduce the discharge of sewage. In short, the problem of cross-flow of sewage could be effectively solved by optimization of sewage channels, transformation of rainwater and sewage facilities, and improvement of sewage treatment measures.
The sewage treatment standards were divided into Level 1, Level 2, and Level 3. According to the Integrated Waste Water Discharging Standard, the first-class standard was applicable to the discharge of sewage into Class III water areas (except for designated protected areas and swimming areas) and Class II sea areas in Class B. The Level 2 standard is applicable to the discharge of sewage into Class IV and V waters in the standard of the national standard 3838 and Class III sea areas in the standard of the national standard 3097. The Level 3 standard was applicable to the situation where the sewage was discharged into the urban drainage system with a secondary sewage treatment plant. The specific standard values and requirements may vary by region and industry.
The sewage interception network was a water pollution treatment project. By constructing and transforming the sewage pipeline inside the sewage generating unit and connecting it to the sewage pipeline system under the city road, the sewage was transported to the sewage treatment plant for treatment. This method was mainly used to control the sewage discharge outlet along the urban water body, the discharge outlet of the initial rainwater or dry running water of the diversion rainwater pipeline, and the permanent engineering management of the discharge outlet along the combined sewage system. The sewage interception network played an important role in urban sewage treatment.
Fishing could be done in Dagu's sewage river. Moreover, it had been filtered and purified layer by layer. The water quality was very good, and the fish could be eaten. Some fishermen caught a variety of fish such as Crucian carp and carp in the Dagu sewage river. However, it was important to note that the water flow in the Dagu sewage river was relatively large, which might affect the fishing experience. In addition, there were also reports of dead fish floating in some areas of the Dagu River, which might be related to the nearby sewage outlets. Therefore, anglers should choose areas with gentle water currents to fish to ensure that the fish caught were of good quality. In general, fishing was allowed in Dagu's sewage river, but one had to choose a suitable location and pay attention to water quality and environmental issues.
The management of sewage overflow belonged to different departments, depending on the location. If the sewage crossflow occurs in a residential area, the property management company should be contacted for treatment. If the sewage crossflow occurred on the main and secondary roads, the municipal company should be contacted to solve the problem. Therefore, the management department of sewage crossflow depended on the specific situation.
The sewage interception pipe technology had the following advantages: it increased the volume load and reduced the sludge production; it had a module design, which could implement local scattered treatment and reduce the scale of the pipe network construction; it could reduce the construction cost of the sewage plant; it adopted automatic remote monitoring and operation, which could realize unmanned operation and save personnel costs; the technical process was simple and was not limited by the site; the quality of the produced water was high; it realized the diversion of rainwater and sewage and improved the utilization rate of water resources.
The whole process of rainwater and sewage diversion construction includes the following steps: First, excavate the trench according to the design requirements, and use the method of combining excavator and manual excavation to ensure that the bottom wall of the trench is flat. Then, the trench side wall support structure was installed, and the Z-shaped steel sheet piles were driven one by one by the static pressure method to form the foundation pit support structure. Next, the assembled socket was installed, and the socket was placed into the groove, which was fixed by the connecting component. Then, the rainwater and sewage diversion pipe was installed in the pipe seat, and the pipe was fixed and stopped by the clamping component and the pressing component. Finally, the pipe base cover was closed and a number of Z-shaped steel sheet piles were pulled out in sequence to fix the pipe base cover to the upper opening of the pipe base. These steps constituted the entire process of rainwater and sewage diversion construction.
The significance of the domestic sewage pipe project was to improve the water environment in urban and rural areas, improve the sewage treatment capacity, protect water resources, and promote sustainable development. This project could improve drainage efficiency, reduce urban waterlogging problems, and improve the urban living environment. At the same time, it could also purify the water environment and reduce the pollution caused by the direct discharge of urban and rural domestic sewage into the water body. In addition, the domestic sewage pipe project could also eliminate black and smelly water bodies, improve the aquatic ecological environment, and reduce the entry of nutrients into the water. For society, a complete sewage pipe network was not only conducive to improving the city's functions and upgrading the city's quality, but also to improving the living environment of residents, improving the happiness index of the people, and meeting the growing needs of the people for a healthy and beautiful ecological environment. Therefore, the domestic sewage pipe project was considered an important livelihood project, which had positive significance for social stability and urban development.
We can come to the following conclusion: The personal work summary of sewage treatment is a document that sums up an individual's performance and achievements in sewage treatment work. According to the document provided, the contents of the personal work summary included learning and improving work ability, paying attention to theoretical study, striving to improve their own quality, earnestly performing their duties, completing work tasks, and abiding by rules and regulations. However, because most of the search results were repetitive and did not provide more specific information, it was impossible to provide a detailed summary of personal work.