下載應用程式
15.45% Starting from the Planetary Governor / Chapter 104: Chapter 103, The Battle of the Power Plant

章節 104: Chapter 103, The Battle of the Power Plant

As the star warriors began their assault, two transport helicopters, carrying a total of nine battle nuns, along with Gu Hang himself, also arrived above the target location.

The target location had six wind turbines arrayed in its vicinity.

After Georgette and others had, through various intelligence, determined that the cult leader was very likely hidden there, Gu Hang urgently had the place investigated, and to his surprise, he discovered that it was actually a small wind farm.

There were a total of eight such wind farms within the whole scope of Revival City.

Since last year, the Alliance Council had approved the construction of these power stations. A company from the north called Polar Industrial Group had won the bid for this project and had started the construction work.

According to the project timeline estimates, these eight wind farms, situated in different locations around the city, should have been completed around some time before now.


本文的第一部分到此結束,請下載Webnovel應用程式繼續閱讀:

掃描QR碼下載Webnovel

Load failed, please RETRY

禮物

禮品 -- 收到的禮物

    每周推薦票狀態

    Rank -- 推薦票 榜單
    Stone -- 推薦票

    批量訂閱

    目錄

    顯示選項

    背景

    EoMt的

    大小

    章評

    寫檢討 閱讀狀態: C104
    無法發佈。請再試一次
    • 翻譯品質
    • 更新的穩定性
    • 故事發展
    • 人物形象設計
    • 世界背景

    總分 0.0

    評論發佈成功! 閱讀更多評論
    用推薦票投票
    Rank NO.-- 推薦票榜
    Stone -- 推薦票
    舉報不當內容
    錯誤提示

    舉報暴力內容

    段落註釋

    登錄