下載應用程式
54.91% Genius of the Rules-Style System / Chapter 854: 448

章節 854: 448

This is still a conservative estimate.

Therefore, the steps for strict design verification are indispensable. The Aviation Group and the technology department must ensure that the design is correct before they can proceed with a substantial amount of evaluation.

For example, verifying the overall weight of the engine.

Performance.

Manufacturing technology requirements.

And so on.

These are not just the design of Group Two anymore, but also involve considering the technology of the cooperating factories and require the cooperation of the aviation materials department, because the materials for many engines may not meet the standards, and in Group Two's design, there is not much detailed discourse on the materials for various parts.

Only after a definite feasibility analysis report is issued can the Aviation Group decide to allocate funds to manufacture prototypes.


本文的第一部分到此結束,請下載Webnovel應用程式繼續閱讀:

掃描QR碼下載Webnovel

Load failed, please RETRY

禮物

禮品 -- 收到的禮物

    每周推薦票狀態

    Rank -- 推薦票 榜單
    Stone -- 推薦票

    批量訂閱

    目錄

    顯示選項

    背景

    EoMt的

    大小

    章評

    寫檢討 閱讀狀態: C854
    無法發佈。請再試一次
    • 翻譯品質
    • 更新的穩定性
    • 故事發展
    • 人物形象設計
    • 世界背景

    總分 0.0

    評論發佈成功! 閱讀更多評論
    用推薦票投票
    Rank NO.-- 推薦票榜
    Stone -- 推薦票
    舉報不當內容
    錯誤提示

    舉報暴力內容

    段落註釋

    登錄