下載應用程式
81.61% Project Overworld / Chapter 111: Pipeline

章節 111: Pipeline

After the first week of work for the Spacol industry, the group assigned to the expansion of their Moon base started running out of crafted parts. A few days later, Keith, Jim and Tyler stocks of metal sheets were totally depleted and the construction of the pipe had to be stopped for the time being.

They had fotunately sent a supply rocket just before embarking onto the 'Triple S', but it did not seem to be enough for the six of them. Their first automatically sent rocket arrived two weeks after they landed on the Moon and their work could resume for good. Since they had turned off their 'Rocket assembler' while they were building the new 'Rocket extender' for the EOSS, there has been a pretty long calibration time for a new rocket to be build in their Earth base before being launched towards their space station.


本文的第一部分到此結束,請下載Webnovel應用程式繼續閱讀:

掃描QR碼下載Webnovel

Load failed, please RETRY

禮物

禮品 -- 收到的禮物

    每周推薦票狀態

    Rank -- 推薦票 榜單
    Stone -- 推薦票

    批量訂閱

    目錄

    顯示選項

    背景

    EoMt的

    大小

    章評

    寫檢討 閱讀狀態: C111
    無法發佈。請再試一次
    • 寫作品質
    • 更新的穩定性
    • 故事發展
    • 人物形象設計
    • 世界背景

    總分 0.0

    評論發佈成功! 閱讀更多評論
    用推薦票投票
    Rank NO.-- 推薦票榜
    Stone -- 推薦票
    舉報不當內容
    錯誤提示

    舉報暴力內容

    段落註釋

    登錄