Tải xuống ứng dụng
39.48% Holy Roman Empire / Chapter 430: Chapter 3, The Suez Canal is Open to Navigation

Chương 430: Chapter 3, The Suez Canal is Open to Navigation

Egypt, the Suez Canal also reached a critical moment after a construction period lasting nine years, it finally neared completion.

This time there were no interruptions or labor shortages. France and Austria cooperated to build the grand canal, the British attempted to cause trouble but ultimately failed, causing their Egyptian cotton planting plan to collapse instead.

The construction took so long for no other reason than that the canal was designed to be four meters deeper than the original Suez Canal in another timeline.

Latter in the actual construction process, engineers from Austria demanded to ensure absolute safety, and they dug a further two meters down.

As the depth increased, the width naturally expanded as well, leading to a greater volume of work. In an era lacking machinery, dealing with the increased earthwork was no small feat.


Đây là kết thúc Phần Một, và tải app Webnovel để tiếp tục:

Quét mã QR để tải Webnovel

Load failed, please RETRY

Quà tặng

Quà tặng -- Nhận quà

    Tình trạng nguồn điện hàng tuần

    Rank -- Xếp hạng Quyền lực
    Stone -- Đá Quyền lực

    Đặt mua hàng loạt

    Mục lục

    Cài đặt hiển thị

    Nền

    Phông

    Kích thước

    Việc quản lý bình luận chương

    Viết đánh giá Trạng thái đọc: C430
    Không đăng được. Vui lòng thử lại
    • Chất lượng dịch thuật
    • Tính ổn định của các bản cập nhật
    • Phát triển câu chuyện
    • Thiết kế nhân vật
    • Bối cảnh thế giới

    Tổng điểm 0.0

    Đánh giá được đăng thành công! Đọc thêm đánh giá
    Bình chọn với Đá sức mạnh
    Rank NO.-- Bảng xếp hạng PS
    Stone -- Power Stone
    Báo cáo nội dung không phù hợp
    lỗi Mẹo

    Báo cáo hành động bất lương

    Chú thích đoạn văn

    Đăng nhập