Tải xuống ứng dụng
42.31% Scholar's Advanced Technological System / Chapter 713: Academician Primary Elections

Chương 713: Academician Primary Elections

Biên tập viên: Henyee Translations

The entire Garden project was divided into three phases.

The first phase of the project was the foundation. Welded stainless steel was used to isolate the ground of the enclosed area. The second phase of the project was mainly regarding the construction part of it. A six-grid steel skeleton would be supported by compression-resistant steel for the entire hemispherical artificial biosphere. As for the third phase of the project, the hemisphere would be equipped with double-layered special glass, where the outer layer would be coated with a special coating material to control the temperature.

There would also be biosphere B, C, D, etc. This would be to simulate other special outer-space environments, such as Mars. It could also be used for developing life support devices for people to use on other planets.


Đây là kết thúc Phần Một, và tải app Webnovel để tiếp tục:

Quét mã QR để tải Webnovel

Load failed, please RETRY

Quà tặng

Quà tặng -- Nhận quà

    Tình trạng nguồn điện hàng tuần

    Rank -- Xếp hạng Quyền lực
    Stone -- Đá Quyền lực

    Đặt mua hàng loạt

    Mục lục

    Cài đặt hiển thị

    Nền

    Phông

    Kích thước

    Việc quản lý bình luận chương

    Viết đánh giá Trạng thái đọc: C713
    Không đăng được. Vui lòng thử lại
    • Chất lượng dịch thuật
    • Tính ổn định của các bản cập nhật
    • Phát triển câu chuyện
    • Thiết kế nhân vật
    • Bối cảnh thế giới

    Tổng điểm 0.0

    Đánh giá được đăng thành công! Đọc thêm đánh giá
    Bình chọn với Đá sức mạnh
    Rank NO.-- Bảng xếp hạng PS
    Stone -- Power Stone
    Báo cáo nội dung không phù hợp
    lỗi Mẹo

    Báo cáo hành động bất lương

    Chú thích đoạn văn

    Đăng nhập