The ground transmission experiment was applied for and its funding came through rather quickly.
The anti-gravity technology group provided assistance, speeding up the parts ordering process. They were to manufacture a unilateral anti-energy barrier device. All new equipment had to be assembled by themselves. The most crucial beam device was relatively simple to order and manufacture, but some components required special production, primarily the beam conduit equipment.
Since the beam conduit equipment was an entirely new design, it needed to be specially made by the manufacturer, which would take some time.
"About a month or so," was the response Zhao Yi got from the anti-gravity technology group.
The theoretical group was somewhat impatient, but they knew new equipment took time to be manufactured.
One month was already quite fast.