ดาวน์โหลดแอป
81.61% Project Overworld / Chapter 111: Pipeline

บท 111: Pipeline

After the first week of work for the Spacol industry, the group assigned to the expansion of their Moon base started running out of crafted parts. A few days later, Keith, Jim and Tyler stocks of metal sheets were totally depleted and the construction of the pipe had to be stopped for the time being.

They had fotunately sent a supply rocket just before embarking onto the 'Triple S', but it did not seem to be enough for the six of them. Their first automatically sent rocket arrived two weeks after they landed on the Moon and their work could resume for good. Since they had turned off their 'Rocket assembler' while they were building the new 'Rocket extender' for the EOSS, there has been a pretty long calibration time for a new rocket to be build in their Earth base before being launched towards their space station.


นี่คือสิ้นสุดของ ส่วนที่หนึ่ง และดาวน์โหลดแอป Webnovel เพื่อดำเนินการต่อ:

สแกน QR code เพื่อดาวน์โหลด Webnovel

Load failed, please RETRY

ของขวัญ

ของขวัญ -- ได้รับของขวัญแล้ว

    สถานะพลังงานรายสัปดาห์

    Rank -- การจัดอันดับด้วยพลัง
    Stone -- หินพลัง

    ป้ายปลดล็อกตอน

    สารบัญ

    ตัวเลือกแสดง

    พื้นหลัง

    แบบอักษร

    ขนาด

    ความคิดเห็นต่อตอน

    เขียนรีวิว สถานะการอ่าน: C111
    ไม่สามารถโพสต์ได้ กรุณาลองใหม่อีกครั้ง
    • คุณภาพงานเขียน
    • ความเสถียรของการอัปเดต
    • การดำเนินเรื่อง
    • กาสร้างตัวละคร
    • พื้นหลังโลก

    คะแนนรวม 0.0

    รีวิวโพสต์สําเร็จ! อ่านรีวิวเพิ่มเติม
    โหวตด้วย Power Stone
    Rank NO.-- การจัดอันดับพลัง
    Stone -- หินพลัง
    รายงานเนื้อหาที่ไม่เหมาะสม
    เคล็ดลับข้อผิดพลาด

    รายงานการล่วงละเมิด

    ความคิดเห็นย่อหน้า

    เข้า สู่ ระบบ