```
Then came the manufacturing or refurbishing.
For some components with new designs, improvements needed to be made at the manufacturing plant; once improved, they were transported here. Other components could be adjusted in the factory to achieve the desired effect.
Zhao Yi quickly came up with the parameter scheme.
The entire engine team became busy, with many engineers involved in the design adjustments. Since it was just a matter of adjusting performance parameters rather than creating a new design, the scheme was easy to come by.
Zhao Yi's job turned into reviewing the project reports and then deciding which scheme to implement or whether to modify an existing one.
Very quickly.
A week passed.
All component adjustment schemes were finalized, and it was time to contact the manufacturing plant; those that could be directly corrected at the factory were promptly revised.
The engine team's operation room became a hive of activity.