Baixar aplicativo
81.61% Project Overworld / Chapter 111: Pipeline

Capítulo 111: Pipeline

After the first week of work for the Spacol industry, the group assigned to the expansion of their Moon base started running out of crafted parts. A few days later, Keith, Jim and Tyler stocks of metal sheets were totally depleted and the construction of the pipe had to be stopped for the time being.

They had fotunately sent a supply rocket just before embarking onto the 'Triple S', but it did not seem to be enough for the six of them. Their first automatically sent rocket arrived two weeks after they landed on the Moon and their work could resume for good. Since they had turned off their 'Rocket assembler' while they were building the new 'Rocket extender' for the EOSS, there has been a pretty long calibration time for a new rocket to be build in their Earth base before being launched towards their space station.


Esta é o fim da Parte Um, baixe o aplicativo Webnovel para continuar:

Digitalize o código QR para baixar o Webnovel

Load failed, please RETRY

Presentes

Presente -- Presente recebido

    Status de energia semanal

    Rank -- Ranking de Poder
    Stone -- Pedra de Poder

    Capítulos de desbloqueio em lote

    Índice

    Opções de exibição

    Fundo

    Fonte

    Tamanho

    Comentários do capítulo

    Escreva uma avaliação Status de leitura: C111
    Falha ao postar. Tente novamente
    • Qualidade de Escrita
    • Estabilidade das atualizações
    • Desenvolvimento de Histórias
    • Design de Personagens
    • Antecedentes do mundo

    O escore total 0.0

    Resenha postada com sucesso! Leia mais resenhas
    Vote com Power Stone
    Rank NO.-- Ranking de Potência
    Stone -- Pedra de Poder
    Denunciar conteúdo impróprio
    Dica de erro

    Denunciar abuso

    Comentários do parágrafo

    Login