Baixar aplicativo
70.79% I Found A Planet / Chapter 349: Planning Ten Steps Ahead

Capítulo 349: Planning Ten Steps Ahead

Editor: Nyoi-Bo Studio

It was now 20X8.

In this particular year, a total of four "Artificial Suns" were put into operation, each of them generating 15 thousand megawatts of power. Together with the previous two "Artificial Suns" with power of 10 thousand megawatts on the land of the Great Z, the number of "Artificial Suns" had increased to six. They had a combined power generation of 80 thousand megawatts which accounted for about 55% of the country's total power generation capacity.

There was also the third-generation nuclear fission power generation which made up 15% of the comprehensive power generation and another 17% comprising of hydraulic, wind, solar, and geothermal power generation.

The total proportion of clean energy had increased to 87%.

Traditional thermal power generation was left with only a 13% share. It had not been completely eliminated because it was still essential in certain industrial production.


Esta é o fim da Parte Um, baixe o aplicativo Webnovel para continuar:

Digitalize o código QR para baixar o Webnovel

Load failed, please RETRY

Presentes

Presente -- Presente recebido

    Status de energia semanal

    Rank -- Ranking de Poder
    Stone -- Pedra de Poder

    Capítulos de desbloqueio em lote

    Índice

    Opções de exibição

    Fundo

    Fonte

    Tamanho

    Comentários do capítulo

    Escreva uma avaliação Status de leitura: C349
    Falha ao postar. Tente novamente
    • Qualidade da Tradução
    • Estabilidade das atualizações
    • Desenvolvimento de Histórias
    • Design de Personagens
    • Antecedentes do mundo

    O escore total 0.0

    Resenha postada com sucesso! Leia mais resenhas
    Vote com Power Stone
    Rank NO.-- Ranking de Potência
    Stone -- Pedra de Poder
    Denunciar conteúdo impróprio
    Dica de erro

    Denunciar abuso

    Comentários do parágrafo

    Login