The construction site bloomed into existence as the first shipments arrived. The prefabs took little effort to put together, though they took up a large portion of the cargo. The extremely rigid ground and soil made it highly difficult to dig through, but the construction team achieved some progress with the help of high-powered diggers.
The first wave of mercenary mechs arrived shortly after the shuttles finished hauling the construction materials. Despite the insufficient facilities, the plan called for unpacking them immediately in order to help secure the base.
As expected, a lot of hijinks happened in the process of taking the mechs out of their containers. The partially detached limbs required a bit of finesse to put them back into their sockets. Having to work in the awful conditions outdoors made everything worse.
Thank you for reading my work! If you wish to support The Mech Touch, please vote with your power stones!