"These are all submarine geological data. Based on your plan, we have designed a path..."
When Tang Rui arrived in Dalian, he was sought out by Professor Zhao.
The other party brought out all the geological data and the designed path of the submarine tunnel they had been planning during this time, letting Tang Rui take a look first.
According to the analysis and research of their group of Professors, the submarine tunnel was not a straight line, but a curved one.
This design was necessary mainly due to the geological conditions of the seabed.
It wasn't that a straight line was impossible, but that approach would make construction more difficult and introduce hidden dangers.
"Hmm, this path is generally fine, but this part needs to be modified," Tang Rui said after reviewing the path plan. He drew a circle on it, indicating a submarine ore vein.