Thanks to the Dwarf King's orders, the mining speed in Black Stone Case Camp had not only accelerated greatly, but even the inventory accumulated these days was not kept in storage.
Usually, the dwarf team would transport four to six carts of coal. A cart was 500kg, and the total weight would be about two tons.
However, today's first cart consisted of nine carts!
This round alone would contribute nearly five tons of coal to the basin!
'According to the boiler's current efficiency, it will consume about 2 tons of coal if it operates the whole day on full power.
'Five tons would only last two days. It's not close to enough!'
The transportation troops followed after the lizard carriage and headed toward the basin's border as soon as the battle was over.
The logistics team did not leave immediately and took the snowmobiles that were prepared in advance, following behind to clean up the traces.