アプリをダウンロード
70.79% I Found A Planet / Chapter 349: Planning Ten Steps Ahead

章 349: Planning Ten Steps Ahead

編集者: Nyoi-Bo Studio

It was now 20X8.

In this particular year, a total of four "Artificial Suns" were put into operation, each of them generating 15 thousand megawatts of power. Together with the previous two "Artificial Suns" with power of 10 thousand megawatts on the land of the Great Z, the number of "Artificial Suns" had increased to six. They had a combined power generation of 80 thousand megawatts which accounted for about 55% of the country's total power generation capacity.

There was also the third-generation nuclear fission power generation which made up 15% of the comprehensive power generation and another 17% comprising of hydraulic, wind, solar, and geothermal power generation.

The total proportion of clean energy had increased to 87%.

Traditional thermal power generation was left with only a 13% share. It had not been completely eliminated because it was still essential in certain industrial production.


これでパート1の終わりです。Webnovelアプリで続けて読む:

QRコードをスキャンしてWebnovelをダウンロードする

Load failed, please RETRY

ギフト

ギフト -- 贈り物 が届きました

    週次パワーステータス

    Rank -- 推薦 ランキング
    Stone -- 推薦 チケット

    バッチアンロック

    目次

    表示オプション

    バックグラウンド

    フォント

    大きさ

    章のコメント

    レビューを書く 読み取りステータス: C349
    投稿に失敗します。もう一度やり直してください
    • 翻訳品質
    • アップデートの安定性
    • ストーリー展開
    • キャラクターデザイン
    • 世界の背景

    合計スコア 0.0

    レビューが正常に投稿されました! レビューをもっと読む
    パワーストーンで投票する
    Rank NO.-- パワーランキング
    Stone -- 推薦チケット
    不適切なコンテンツを報告する
    error ヒント

    不正使用を報告

    段落のコメント

    ログイン