Unduh Aplikasi
64.17% Holy Roman Empire / Chapter 430: Chapter 3, The Suez Canal is Open to Navigation

Bab 430: Chapter 3, The Suez Canal is Open to Navigation

Egypt, the Suez Canal also reached a critical moment after a construction period lasting nine years, it finally neared completion.

This time there were no interruptions or labor shortages. France and Austria cooperated to build the grand canal, the British attempted to cause trouble but ultimately failed, causing their Egyptian cotton planting plan to collapse instead.

The construction took so long for no other reason than that the canal was designed to be four meters deeper than the original Suez Canal in another timeline.

Latter in the actual construction process, engineers from Austria demanded to ensure absolute safety, and they dug a further two meters down.

As the depth increased, the width naturally expanded as well, leading to a greater volume of work. In an era lacking machinery, dealing with the increased earthwork was no small feat.


Ini adalah akhir Bagian Satu, dan unduh aplikasi Webnovel untuk melanjutkan:

Pindai kode QR untuk mengunduh Webnovel

Load failed, please RETRY

Hadiah

Hadiah -- Hadiah diterima

    Status Power Mingguan

    Rank -- Peringkat Power
    Stone -- Power stone

    Membuka kunci kumpulan bab

    Indeks

    Opsi Tampilan

    Latar Belakang

    Font

    Ukuran

    Komentar pada bab

    Tulis ulasan Status Membaca: C430
    Gagal mengirim. Silakan coba lagi
    • Kualitas Terjemahan
    • Stabilitas Pembaruan
    • Pengembangan Cerita
    • Desain Karakter
    • Latar Belakang Dunia

    Skor total 0.0

    Ulasan berhasil diposting! Baca ulasan lebih lanjut
    Pilih Power Stone
    Rank NO.-- Peringkat Power
    Stone -- Batu Daya
    Laporkan konten yang tidak pantas
    Tip kesalahan

    Laporkan penyalahgunaan

    Komentar paragraf

    Masuk