Télécharger l’application
100% Love's Alchemy: Breaking Shadows (BL) / Chapter 41: 2.6 Behind Schedule, Behind Closed Doors

Chapitre 41: 2.6 Behind Schedule, Behind Closed Doors

Huang slammed his fist down on his desk, frustration knotting his brow. Grabbing his cellphone, he dialed, only to be met with the unwelcome tone of voicemail. That bastard had even gone as far as to block his number.

For days, they had been anticipating the arrival of the new VP of Engineering, but now all they received was a curt email, stating his absence and desire for solitude. They were already behind schedule, with Dorian missing from work for over a week.

Pressing a button, Huang issued a command, his tone terse yet determined, "Summon Tan and Shaofeng to my office."

"Yes, President Zhu," came the swift reply.

Within minutes, Tan and Shaofeng entered, taking seats across from him.

Huang wasted no time in addressing the issue at hand, "Dorian's replacement isn't joining us."

Frowns creased Tan and Shaofeng's brows. Tan inquired, "Did you offer him a higher salary?"


Ceci est la fin de la partie un, et téléchargez l'application Webnovel pour continuer:

Scannez le code QR pour télécharger l'application Webnovel

next chapter
Load failed, please RETRY

Un nouveau chapitre arrive bientôt Écrire un avis

Cadeaux

Cadeau -- Cadeau reçu

    État de l’alimentation hebdomadaire

    Rank -- Classement Power Stone
    Stone -- Power stone

    Chapitres de déverrouillage par lots

    Table des matières

    Options d'affichage

    Arrière-plan

    Police

    Taille

    Commentaires sur les chapitres

    Écrire un avis État de lecture: C41
    Échec de la publication. Veuillez réessayer
    • Qualité de l’écriture
    • Stabilité des mises à jour
    • Développement de l’histoire
    • Conception des personnages
    • Contexte du monde

    Le score total 0.0

    Avis posté avec succès ! Lire plus d’avis
    Votez avec Power Stone
    Rank NO.-- Classement de puissance
    Stone -- Pierre de Pouvoir
    signaler du contenu inapproprié
    Astuce d’erreur

    Signaler un abus

    Commentaires de paragraphe

    Connectez-vous