Télécharger l’application
32.37% Cave Refuge / Chapter 226: Chapter 225: The Beginning of Cooling Down_1

Chapitre 226: Chapter 225: The Beginning of Cooling Down_1

The structure of the geothermal equipment is actually very simple. Despite having been destroyed by the electromagnetic pulse and submerged by the flood, they were rebuilt by some handcraft professionals organized by the government officials after the flood subsided.

Although they're not as compact as those manufactured before the disaster with the aid of lathes, their function isn't affected at all.

To supply all the Refuges Centers in the city area with geothermal devices, the Officials specially built an underground power plant. Most of the time, it generates electricity on a small scale, not only to ensure the normal operation of the power plant but also to ensure the operation of the underground plantation and breeding areas.


Ceci est la fin de la partie un, et téléchargez l'application Webnovel pour continuer:

Scannez le code QR pour télécharger l'application Webnovel

Load failed, please RETRY

Cadeaux

Cadeau -- Cadeau reçu

    État de l’alimentation hebdomadaire

    Rank -- Classement Power Stone
    Stone -- Power stone

    Chapitres de déverrouillage par lots

    Table des matières

    Options d'affichage

    Arrière-plan

    Police

    Taille

    Commentaires sur les chapitres

    Écrire un avis État de lecture: C226
    Échec de la publication. Veuillez réessayer
    • Qualité de la traduction
    • Stabilité des mises à jour
    • Développement de l’histoire
    • Conception des personnages
    • Contexte du monde

    Le score total 0.0

    Avis posté avec succès ! Lire plus d’avis
    Votez avec Power Stone
    Rank NO.-- Classement de puissance
    Stone -- Pierre de Pouvoir
    signaler du contenu inapproprié
    Astuce d’erreur

    Signaler un abus

    Commentaires de paragraphe

    Connectez-vous