The specific Moon development plan is an extremely colossal project. The base can only establish a rough framework at most; the details still need to be fleshed out by other participants over time.
However, preliminary preparations such as the lunar space station and the lunar surface fuel extraction system have already entered an accelerated phase, with plans to start construction when the Dawn program begins its lunar landing.
At the same time, this also means that the base is preparing to send humans to the station.
In the unmanned fuel extraction system, the MTV only needs to be modified into a manned version to become a Space Shuttle that can shuttle between the lunar surface and low lunar orbit; it is a crucial means for transferring mass to the lunar surface in the future.