A few more days passed, Alterra was now celebrating the grand opening of a new construction.
The Grand Hotel.
It was deferred for a bit due to the other construction projects that were much more urgent.
But now that the heatwave was over—and with the injection of new manpower—the construction went full force.
Also, after much study, Althea's worry about the manual constructions being much more susceptible to attacks versus system buildings was more or less unfounded.
This was because the Limestone—or any other construction material—in Xeno was also doused in Aether. It was much stronger than what could be built in Terran! As long as they constructed it well, it would be just as fine as system buildings.
It was similar to the strength of residential buildings and the custom houses from the system except theirs was better because of the methodology.
A bit of Alterra before we finish pre-timeskip with a few more reunions~