App herunterladen
81.61% Project Overworld / Chapter 111: Pipeline

Kapitel 111: Pipeline

After the first week of work for the Spacol industry, the group assigned to the expansion of their Moon base started running out of crafted parts. A few days later, Keith, Jim and Tyler stocks of metal sheets were totally depleted and the construction of the pipe had to be stopped for the time being.

They had fotunately sent a supply rocket just before embarking onto the 'Triple S', but it did not seem to be enough for the six of them. Their first automatically sent rocket arrived two weeks after they landed on the Moon and their work could resume for good. Since they had turned off their 'Rocket assembler' while they were building the new 'Rocket extender' for the EOSS, there has been a pretty long calibration time for a new rocket to be build in their Earth base before being launched towards their space station.


Dies ist das Ende von Teil Eins. Lade die Webnovel App herunter, um fortzufahren:

Scannen Sie den QR-Code, um Webnovel herunterzuladen

Load failed, please RETRY

Geschenke

Geschenk -- Geschenk erhalten

    Wöchentlicher Energiestatus

    Rank -- Power- Rangliste
    Stone -- Power- Stein

    Stapelfreischaltung von Kapiteln

    Inhaltsverzeichnis

    Anzeigeoptionen

    Hintergrund

    Schriftart

    Größe

    Kapitel-Kommentare

    Schreiben Sie eine Rezension Lese-Status: C111
    Fehler beim Posten. Bitte versuchen Sie es erneut
    • Qualität des Schreibens
    • Veröffentlichungsstabilität
    • Geschichtenentwicklung
    • Charakter-Design
    • Welthintergrund

    Die Gesamtpunktzahl 0.0

    Rezension erfolgreich gepostet! Lesen Sie mehr Rezensionen
    Stimmen Sie mit Powerstein ab
    Rank NR.-- Macht-Rangliste
    Stone -- Power-Stein
    Unangemessene Inhalte melden
    error Tipp

    Missbrauch melden

    Kommentare zu Absätzen

    Einloggen